English

The ‘bell’ of increased costs: Madgulkar Theater costs from 37 crores to 70 crores!

The work is still half-baked, and expenses have increased even under administrative rule

Pimpri. Mahanews. Special Representative.

Akurdi with 800 audience capacity in the year 2013 to satisfy the cultural hunger of the citizens – Senior Literary in the authority c. gave The work of constructing Madgulkar Theater was started. However, as the officials, officers and contractors of the municipal corporation were not satisfied with money, the work of this theater reached from 37 crores to 70 crores in eight years. Now 10 lakhs will be spent on furniture and other minor works for the makeup room of the actors in this theatre. At present, work on the conference hall, art gallery, cafeteria, residential rooms and exterior decoration is incomplete.


On behalf of Pimpri – Chinchwad Municipal Corporation, Akurdi – Senior Literary in the Authority. gave In the name of Madgulkar, a theater with a seating capacity of 800 is being constructed. This theater is being built on a plot of 5 thousand square meters in Peth No. 26. The theater is planned to have a small auditorium with 220 audience capacity, a conference hall with 110 seating capacity and art gallery and 12 residential rooms. It is planned to arrange electricity and sound system in a modern manner in the theater. Amphitheater, restaurant will also be provided for the citizens. The work of this theater was approved in the year 2013. At that time, an expenditure of 37 crores was expected. After that the cost has reached 70 crores.
The work of the theater is slow…

The work on the theater has been slow from the beginning. Currently, the work in this theater is in the final stage. The furniture and other minor works required for the makeup room of the actors in the theater will be done. A fund of around 10 lakh rupees is required for this. As this theater is going to be inaugurated soon, these furniture works need to be done urgently. Therefore, the furniture and other minor works required for the make-up room in the actors’ room of Akurdi Theater will be done. 10 lakhs will be spent for it.

Job AlertJob Alert Job Alert Job Alert

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button